1. Overview

The traditional solution of using a frequency inverter to drive an asynchronous motor in mining belt conveyors has several shortcomings, such as poor driving stability, low transmission efficiency, unbalanced power distribution between the master and slave units, and high energy consumption. With the rapid development of permanent magnet direct - drive technology and frequency conversion technology, the ore transportation solution now offers higher efficiency, lower power consumption, better reliability, longer transmission distance, and stronger multi - machine master - slave synchronization performance. This article introduces the application solution of the Yolico YDS8000 series frequency inverters for power balance in the permanent magnet direct - drive system of coal mine belt conveyor equipment.

2. Solution

The motor model is an external - rotor roller integrated permanent magnet synchronous motor (14.67hz/44rpm, 240A), and the frequency inverter model is YDS8160 T4N.

Introduction to the equipment process:
Figure 1: Schematic diagram of the belt conveyor

http://www.plyxj.cn/en/Data/upload/20250329/3f6b7e276fbe5c0fe54bd1ecedc27603.png

There are two frequency inverters, which control Motor 1 and Motor 2 respectively.
The control modes of the two motors are master speed control and slave torque control respectively. They are connected via analog signals.
The master motor sends two analog instruction, a speed instruction and a torque instruction to the slave station. To achieve synchronous performance, the speed variation rate is required within 5%.


http://www.plyxj.cn/en/Data/upload/20250329/d90e9f5ce5b0c9edcbfba5270730da25.png

On-site commissioning photos of the belt conveyor

http://www.plyxj.cn/en/Data/upload/20250329/3ca3b370140897baaf816fbbf7034018.png

The process of factory installation and commissioning

http://www.plyxj.cn/en/Data/upload/20250329/aa460f38929858f6768934f2b6f16d16.pnghttp://www.plyxj.cn/en/Data/upload/20250329/fd332b26d6ddeaf9ded135c89bfe5293.png

http://www.plyxj.cn/en/Data/upload/20250329/1de6d8890bb1c7d4da1aa05988709cc2.pnghttp://www.plyxj.cn/en/Data/upload/20250329/2918766172a39c5a3648309fc2271d2b.png

3. Conclusion

(1) The belt and the roller run smoothly during the transportation, the operating current of the frequency inverter remains stable at around 240A.

(2) The frequency inverter is not be interfered during the switching process while cooperating with the operation bypass function of the system’s power frequency.

(3) The frequency inverter can be started when the belt is fully loaded and the current is around 360A at startup moment.

(4) The interface between the frequency inverter and the controller, as well as the communication and monitoring act normally without any interference or disconnection phenomena.

(5) During the startup and stop processes, the belt moves smoothly without any slipping or roller vibration.

主站蜘蛛池模板: av小簧片在线亚洲天堂在线 | 欧美视频一 | 精品视频—区二区三区免费 | 国产精品资源一区二区 | 少妇精品无码一区二区三区 | 国产成人精品久久一区二区三区 | 爱视频福利 | 麻豆传媒视频在线观看 | 精品美女| 亚洲色无码a片一区二区麻豆 | 狠狠色噜噜狠狠狠狠88 | 国产精品久久久久久无毒不卡 | 九九久久九九 | 2020久久精品亚洲热综合 | 一本—道久久a久久精品蜜桃 | 国产男女免费完整视频网页 | 国产一区二区在线观看免费 | 久久久精品国产免费观看同学 | 香蕉视频黄色片 | 女人16毛片a级毛片成年 | 日本高清视频在线 | 黄色大片网站 | 男人下部进女人下部视频 | 六月婷婷综合激情 | 99精品国产一区二区三区不卡 | 亚洲精品乱码久久久久久日本蜜臀 | 91伦理视频在线观看 | 真实国产普通话对白乱子子伦视频 | 狠狠噜天天噜日日噜AV | 久久无码人妻丰满熟妇区毛片 | 免费无码黄动漫在线观看 | 日本一区二区三区在线播放 | av中文在线观看 | 国产九色sp调教91 | 久久成人国产精品入口 | 精品一久久香蕉国产线看观看古代 | 日本XXXXX少妇| 老司机午夜永久免费影院 | xxxxxhd中国| 亚洲一级片a级国产 | 欧美va亚洲va日韩∨a综合色 |